Remarkables

Project Details

Location
Queenstown
Architect / Designer
Michael Wyatt Architects
Builder
Arrow Construction
Fabricator
E13 Windows
Suites/Products
Oakley Thermal Curtain Wall
Industry Sector
Recreation, Commercial

The functional requirements of the brief were for a new Remarkables base building. Consisting of office space, ticketing, rental area, cafeteria and crèche.

"We engaged with Vistalite Otago in the early stages of design. We wanted to understand how the windows were going to cope with 270km/hr winds and how mullion centres and glass thicknesses would interact. We arrived at a module that worked with structural support centres and economic yields that were not in conflict with our architectural considerations. We needed a thermally broken profile that could withstand the big wind forces. A bolt on bead was the only way to resist the suction loads" says Wyatt.

The technical requirements were for a seismic 160mm Thermal curtain wall system. The system had to meet extreme wind loads and weather conditions. Having the bolt on bead with captive external glazing gaskets and the thermal break made this ideal. This also meant the windows had to be erected in stick form. This was fast to manufacture but slow to install.

This project was challenging, complex and exhilarating all at the same time. 

The ethereal requirements were for the building to be a future landmark. The volumetric void within the building provided scale and grandeur while also capturing the breathtaking mountain views beyond.

To achieve these ethereal feats there were many challenges along the way, including; providing full shop drawings just in time for metal ordering. Metal arriving just in time for manufacture. Construction delays due to bad weather. Working in sub zero conditions on scissor lifts and snorkel booms. Working 12 hour days, 7 days a week for 9 weeks straight to meet the programme. Having to continually fit chains to vehicles to get up and down the mountain.

The overall job was completed one week late due to snow and gale force winds which closed the mountain for a couple of days just before the grand opening by John Key. Overall a great project with great people who all pulled together to make the almost impossible possible.

Remarkables Base
Remarkables Base
Remarkables Base - Glass Curtain Wall
Remarkables Base - View of mountains from curtain wall
Remarkables Base - View of ski field from inside